Feeds:
Posts
Comments

Archive for February 5th, 2009

It was a long day today, while working with Mike R. we got the centrifugal chiller put back together, the motor mounted, wired to the starter, gaskets replaced on the suction elbow, and the gantry taken down. I still have a few things to do before I’m ready to put the 2,300 Lbs of refrigerant back into the machine. I need to [...]

Read Full Post »